Page 123 - FY 2021-22 Blue Book Volume 2
P. 123
Bureau of Street Lighting
Design and Construction
Program Changes Direct Cost Positions Total Cost
Changes in Salaries, Expense, Equipment, and Special
Continuation of Services
17. Vision Zero 442,084 - 653,483
Continue funding and resolution authority for four positions
consisting of two Street Lighting Electricians and two Electrical
Craft Helpers. Continue resolution authority without funding for
three positions consisting of two Street Lighting Electricians
and one Electrical Craft Helper. These positions provide
design, coordination, and construction engineering services for
various street lighting projects to facilitate implementation of
the Vision Zero Program. Four vacant positions consisting of
two Street Lighting Engineering Associate IIs, one Civil
Engineering Drafting Technician, and one Electrical Craft
Helper are not continued. Continue one-time funding in the
Operating Supplies Account to support these projects. Funding
is provided by the Measure R Local Return Fund. Funding for
two Street Lighting Electricians and one Electrical Craft Helper
will be provided through interim appropriations from the Road
Maintenance and Rehabilitation Program Special Fund. See
related Bureaus of Engineering and Street Services and
Department of Transportation items. Related costs consist of
employee benefits.
SG: $334,484 EX: $107,600
Related Costs: $211,399
18. Metro Annual Work Program 1,353,481 - 2,007,303
Continue funding and resolution authority for 14 positions
consisting of one Street Lighting Engineer, one Street Lighting
Engineering Associate (SLEA) IV, two SLEA IIIs, six SLEA IIs,
three Civil Engineering Drafting Technicians, and one
Management Analyst. These positions support the Los Angeles
Metropolitan Transportation Authority (Metro) Annual Work
Program. Five vacant positions consisting of one Street
Lighting Engineer, one SLEA IV, one SLEA III and two SLEA
IIs are not continued. Front funding is provided by the
Proposition C Anti Gridlock Transit Improvement Fund
($825,384) and the Measure M Local Return Fund ($528,097),
and the costs will be fully reimbursed by Metro. See related
Bureaus of Contract Administration, Engineering, and Street
Services, and Department of Transportation items. Related
costs consist of employee benefits.
SG: $1,353,481
Related Costs: $653,822
593