            37. Traffic Signals Support                                         7,134,692         -    10,555,906
                Continue funding and resolution authority for 72 positions
                consisting of one Cement Finisher, two Electrical Craft Helpers,
                three Assistant Signal Systems Electricians, 21 Signal Systems
                Electricians, two Signal System Supervisor Is, one Graphic
                Designer II, three Transportation Engineers, six Civil
                Engineering Drafting Technicians, 19 Transportation
                Engineering Associate IIs, 11 Transportation Engineering
                Associate IIIs, two Transportation Engineering Associate IVs,
                and one Senior Transportation Engineer. One Civil Engineering
                Drafting Technician and one Transportation Engineering
                Associate II are not continued. These positions support the
                ongoing workload for design, construction, maintenance, and
                operations of all traffic signals to ensure the traffic network and
                the City's Automated Traffic Surveillance and Control
                infrastructure is working effectively.  Seven of these positions
                support the Los Angeles Metropolitan Transportation Authority
                (Metro) Annual Work Program and will be fully reimbursed by
                Metro. Funding is provided by the Proposition C Anti-Gridlock
                Transit Fund ($6,946,404) and the Proposition A Local Transit
                Assistance Fund ($188,288). Partial reimbursement for 40
                positions is provided by various grantors as part of the
                Transportation Grant Fund Work
                SG: $7,134,692
                Related Costs: $3,421,214
            38. Safety-Related Traffic Signal Construction                              -         -             -
                Continue resolution authority for five positions consisting of
                four Transportation Engineering Associate IIs and one Signal
                Systems Electrician to support the accelerated design,
                construction, and inspection of safety-related traffic signal
                projects. Funding will be provided through interim
                appropriations from the Road Maintenance and Rehabilitation
                Program Special Fund (SB1).
            39. DWP Water Trunk Line Program - Traffic Signals                   631,760          -       929,417
                Continue funding and resolution authority for six positions
                consisting of one Signal Systems Electrician, one
                Transportation Engineer, and four Transportation Engineering
                Associate IIs. These positions support the Department of
                Water and Power (DWP) water trunk line construction program.
                All costs for this program are fully reimbursed by DWP. Related
                costs consist of employee benefits.
                SG: $631,760
                Related Costs: $297,657