Page 318 - FY 2021-22 Blue Book Volume 2
P. 318

Capital Finance Administration Fund



            48. Sepulveda Recreation Center Improvements                             4,000,000            2,694,000

            49. Sixth Street Viaduct – Park, Arts, River, and Connectivity           1,000,000            674,000
               Improvements (PARC)

            50. Sixth Street Viaduct Replacement Project –                          36,700,000             24,721,000
               Supplemental Construction Funding
            51. Slauson Connect Incubator and Cultural Center                          800,000             539,000

            52. Southeast (Main Street) Yard Fire Damaged Buildings                    300,000            202,000
               Demolition and Reconstruction
            53. Space Optimization Tenant Work                                                 2,000,000            1,347,000

            54. Studio City Recreation Center - New Gymnasium                                  7,000,000            4,715,000

            55. Sylmar Senior Center                                                           1,500,000            1,010,000
            56. Verdugo Hills Pool and Bathhouse                                                  518,000   349,000

            57. 77th Street Regional Jail Section Sprinkler Replacement                              545,622    368,000

                                                   SUBTOTAL                                       $   83,151,082           $    57,358,000
                                                                                    2
            MICLA Funding Restoration for Deferred CTIEP Municipal Facilities Projects :
            58. City Hall East Electrical System Upgrades and P4 Improvement                       1,250,000   842,000

            59. Old Arlington (Washington Irving) Library                                         940,000   633,000
            60. Solar Energy Installation Municipal Facilities                                 3,000,000                  2,021,000

            61. Warner Grand Theatre                                                         10,000,000                  6,736,000

                                                   SUBTOTAL                                        $  15,190,000        $   10,232,000
            CTIEP – LOS ANGELES CONVENTION CENTER


            62. Fire Pump Controller Replacement                                        135,000             91,000

            63. Generator Controls Upgrade                                              150,000           101,000

            64. Gilbert Lindsey Plaza Demolition and Resurfacing                     2,000,000                  1,347,000
            65. HVAC Boiler Pump Motor Replacement                                      130,000                 88,000

            66. Waterproofing Upgrades Phase II                                      4,000,000                  2,694,000

                                                 SUBTOTAL                          $     6,415,000          $     4,321,000
                                               CTIEP TOTAL                         $  106,756,082            $   71,991,000

                                             GRAND TOTAL                           $ 228,157,000          $ 111,573,000




            2  The projects were previously authorized by the Mayor and Council for MICLA financing. As part of the 2020-21 Second Financial
              Status Report, the Mayor and Council approved the deferral of these projects in order to create capacity for deficit borrowing as
              a debt option to close the budget gaps created by the COVID-19 pandemic (C.F. 20-0600-S84). In the 2020-21 Third FSR, (C.F.
              20-0600-S90), however, the Mayor and Council approved a plan that did not require deficit borrowing to balance the budget.
              Thus, the 2021-22 Proposed Budget restores several of the deferred projects.
                                                             784
   313   314   315   316   317   318   319   320   321   322   323