Page 246 - FY 2020-21 Blue Book Volume II
P. 246

Transportation

                                               Traffic Signals and Systems
                                  Program Changes                           Direct Cost  Positions   Total Cost
           Changes in Salaries, Expense, Equipment, and Special
           Continuation of Services
            68. B-Permit Plan Review                                             602,828          5       857,044
                Continue funding and add regular authority for five positions
                consisting of one Transportation Engineer and four
                Transportation Engineering Associate IIIs to review B-Permit
                plans. These positions are fully reimbursed by permit fees.
                Related costs consist of employee benefits.
                SG: $602,828
                Related Costs: $254,216

            69. Sidewalk Repair Support                                          340,666          4       500,682
                Continue funding and add regular authority for four positions
                consisting of one Signal Systems Supervisor I, one Signal
                Systems Electrician, one Assistant Signal Systems Electrician,
                and one Electrical Craft Helper to support both the City's
                Sidewalk Repair Program and the Bureau of Street Services'
                grant-funded sidewalk capital projects, which require traffic
                signal crews to make repairs, to relocate, or construct traffic
                signal equipment and cabling as part of repairing the sidewalk.
                Funding is provided by the Sidewalk Repair Fund ($170,333)
                and the Proposition C Anti-Gridlock Transit Fund ($170,333).
                Grant funded work will be fully reimbursed by grantors. Related
                costs consist of employee benefits.
                SG: $340,666
                Related Costs: $160,016
            70. Safety-Related Traffic Signal Construction                              -         -             -
                Continue resolution authority for five positions consisting of
                four Transportation Engineering Associate IIs and one Signal
                Systems Electrician to support the accelerated design,
                construction, and inspection of safety-related traffic signal
                projects. Funding will be provided through interim
                appropriations from the Road Maintenance and Rehabilitation
                Program Special Fund (SB1).
            71. DWP Water Trunk Line Program - Traffic Signals                   637,464          -       916,212
                Continue funding and resolution authority for six positions
                consisting of one Signal Systems Electrician, one
                Transportation Engineer, and four Transportation Engineering
                Associate IIs. These positions support the Department of
                Water and Power (DWP) water trunk line construction program.
                All costs for this program are fully reimbursed by DWP. Related
                costs consist of employee benefits.
                SG: $637,464
                Related Costs: $278,748
           TOTAL Traffic Signals and Systems                                  (2,925,143)        20

          D     2019-20 Program Budget                                         27,010,867       122
                 Changes in Salaries, Expense, Equipment, and Special         (2,925,143)         20
                2020-21 PROGRAM BUDGET                                         24,085,724       142

                                                             712
   241   242   243   244   245   246   247   248   249   250   251