Page 448 - FY 2020-21 Blue Book Volume II
P. 448

Measure R Traffic Relief and Rail Expansion Funds


                                                                                    2019-20            2020-21
                                                                                Adopted Budget     Proposed Budget
             SPECIAL PURPOSE FUND APPROPRIATIONS

             Automated  Traffic  Surveillance  and  Control  (ATSAC)  System   $             3,000,000   $             3,000,000
             Maintenance  -  Funds  are  provided  for  ongoing  maintenance
             requirements  such  as  camera  maintenance  and  replacement,
             replacement  of  items  such  as  transceivers,  receivers,  servers,  and
             fusion splicers, repair of trunk line breaks, software licensing, wireless
             and  telephone  drop  connections,  video  wall  maintenance,  hub
             maintenance, replacement of hub buildings, and video central switcher
             maintenance.

             Bicycle Plan/Program – Other - Five percent of the estimated local                  2,430,000                  1,300,000
             return revenue is typically provided for bicycle projects within the City.
             For 2020-21, 2.7 percent is provided for bicycle projects.

             Great Streets* - Funds are provided for one-time support for advanced               1,000,000               500,000
             planning and construction improvements on Great Street corridors.


             Median Island Maintenance - Funds are provided for the maintenance                     -     1,000,000
             of median islands citywide. In 2019-20, $2.0 million was provided in the
             Bureau of Street Services’ operating budget for this program.


             Paint  and  Sign  Maintenance  -  Funds  are  provided  to  support  the               1,729,312                 1,800,000
             purchase of paint and sign maintenance equipment and supplies for
             striping  and  pavement  markings  for  City  streets.  Funds  are  also
             provided in the Proposition C Anti-Gridlock Transit Fund ($100,000) and
             the Measure M Local Return Fund ($1,171,000).

             Pavement  Preservation  Overtime  -  Funds  are  provided  for  the                  700,000                  700,000
             Department of Transportation’s Pavement Preservation overtime needs.

             Pedestrian Plan/Program* - Five percent of the estimated local return               2,430,000               1,300,000
             revenue is typically provided for pedestrian projects within the City. For
             2020-21, 2.7 percent is provided for pedestrian projects.

             Technology and Communications - Funds are provided for technology           25,000                     25,000
             and communications requests.

             Vision Zero Contracts, Speed Surveys, Outreach Campaign - Funds                  200,000                    200,000
             were  previously  provided  for  speed  zone  surveys,  education  and
             outreach, and campaign messaging.  For 2020-21, funds are provided
             for the renewal or extension of speed zone surveys along the High Injury
             Network. For 2020-21, $1.0 million in funding for education, outreach,
             and  campaign  messaging  is  also  provided  in  the  Measure  M  Local
             Return Fund.

             Reimbursement  of  General  Fund  Costs*  -  Funds  are  provided  to            12,215,363              12,751,137
             reimburse the General Fund for fringe benefits and partially reimburse
             for central services.

                                             Subtotal Special Purpose Fund Appropriations    $           23,729,675   $           22,576,137

                                                                               TOTAL APPROPRIATIONS     $          58,858,903    $          55,254,750

            * 2020-21 appropriations for Great Streets ($500,000) and Pedestrian Plan/Program ($1,300,000) are not authorized
            until January 1, 2021. In addition, $6,375,568 of the Reimbursement of General Fund Costs appropriation is not
            authorized until January 1, 2021.
                                                             910
   443   444   445   446   447   448   449   450   451   452   453