Page 337 - FY 2021-22 Blue Book Volume 2
P. 337
CTIEP – Municipal Facilities
MICLA-ISSUED FINANCING (cont.)
CATEGORY PROJECT TITLE ACTIVITY* 2021-22 AMOUNT
1, 3 City Hall East Electrical System Upgrades C $ 1,250,000
and P4 Improvement
Funding is provided for the mechanical, electrical, plumbing and capital improvements to complete a cooling system
and create a redundant power supply for the City Hall East server room operated by the Information Technology
Agency.
3 Citywide Electric Vehicle Charger Infrastructure C $ 3,000,000
Funding is provided for the installation of electric vehicle charging stations at various locations for City fleet vehicles
and employee and public parking. Future projects will be prioritized to address high-demand and project readiness
that is determined based on electrical capacity and other factors such as location and size of the facility.
1, 3 Citywide HVAC Improvements C $ 1,772,000
Funding is provided for as-needed repair and replacement of heating, ventilation, and air conditioning (HVAC) issues
on a citywide basis.
1, 3 Citywide Infrastructure Improvements C $ 1,000,000
Funding is provided to address health and safety-related infrastructure issues on a citywide basis. Projects include
safety and security repairs, air-conditioning, water supply systems, fixtures, and other critical maintenance items.
1, 3 Citywide Roof Capital Repairs C $ 760,000
Funding is provided for critical roof removal, replacement of damaged or degraded roofs, downspouts, gutters,
expansion joints, waterproofing, and expanded cool roof applications.
3 Electric Vehicle Charger Installation and Power C $ 1,000,000
Upgrades - Police
Funding is provided to continue the expansion of electric vehicle charging stations at multiple LAPD facilities
throughout the City.
1, 3 Fire Station No. 31 D $ 1,818,750
Funding is provided for pre-development and design activities for the new Fire Station No. 31 in Sylmar.
1, 2 Hollywood Recreation Center Phase II - Modern C $ 2,000,000
Gymnasium
Funding is provided to address a funding shortfall to proceed with the replacement of the existing gymnasium with a
modern facility as part of a final phase of the Proposition K Specified project authorized for this facility.
1, 3 Municipal Buildings Energy and Water Management C $ 1,517,710
and Conservation
Funding is provided for energy audits, engineering, retro-commissioning, and retrofit work at various City facilities.
* “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.
803