CTIEP – Municipal Facilities

            MICLA-ISSUED FINANCING (cont.)

            CATEGORY PROJECT TITLE                                                ACTIVITY*     2021-22 AMOUNT

               1, 3, 4    77th Street Regional Jail Section Sprinkler Replacement     C              $      545,622

            Funding is provided to upgrade an obsolete fire life sprinkler safety system at the 77th Street Regional Jail that is
            contributing to operational hazards for inmates, police staff, and other impacted City operations.

                  3       Los Angeles Convention Center (LACC) Fire Pump              C              $      135,000
                          Controller Replacement

            Funding is provided to replace four control panels that control the West Hall fire pumps.

                  3       LACC Generator Controls Upgrade                             C              $      150,000

            Funding is provided to upgrade three 1600kW generator control panels and voltage regulators that operate the
            LACC’s emergency generators.

                  3       LACC Gilbert Lindsey Plaza Demolition and Resurfacing       C              $   2,000,000

            Funding is provided for the demolition and resurfacing of Gilbert Lindsay Plaza, including clearing, grading, and
            finishing of the site.

                  3       LACC HVAC Boiler Pump Motor Replacement                     C              $      130,000

            Funding is provided to replace three boiler pumps and motors that are part of the heating system for South and
            Concourse Halls.

                1, 3      LACC Waterproofing Upgrades Phase II                        C              $   4,000,000

            Funding is provided to upgrade corrugated metal roof components and the door threshold waterproofing assembly
            over South and Concourse Halls to address worsening water intrusion issues at the LACC.

            Subtotal MICLA Financing                                                                $104,756,082































            * “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.