Page 345 - FY 2021-22 Blue Book Volume 2
P. 345
CTIEP – Physical Plant
STORMWATER PROJECTS
The capital improvements listed in this section are funded from the General Fund, Measure W Local Return Fund and
the SB1 Fund.
CATEGORY* PROJECT TITLE ACTIVITY** 2021-22 AMOUNT
WQ 2 Street/LA River Removal and Reuse C $ 2,737,951
nd
Urban Flow System (aka LAR Segment B
Urban Runoff Project No. 1 – R2-02)
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a 13-foot box
storm drain along 2nd Street by installing a diversion weir and drop inlet into a low flow diversion structure. The
diverted flow will be pumped into an existing 22-inch sanitary sewer main in Alameda Street.
FC Beverlywood Street Storm Drain C $ 512,000
Funding is provided by the SB1 Fund for the construction of 450 linear feet of 24-inch diameter storm drain,
maintenance holes, catch basins, junction structures, and laterals along Beverlywood Street, from Holt Ave. and
Corning Street. This project will alleviate flooding and improve safety of vehicle and pedestrian traffic.
FC Branford Street - Arleta Ave. to Pacoima Wash C $ 4,975,000
Funding is provided by the SB1 Fund for the construction of 600 feet of 36-inch storm drain in Branford Street from the
outlet at the Pacoima Wash Diversion Channel northeasterly to Arleta Ave. This project will alleviate frequent flooding
of the road and will improve safety of vehicle and pedestrian traffic by preventing the accumulation of water.
FC Collier Winnetka Storm Drain C $ 1,582,234
Funding is provided by the SB1 Fund for the construction of 300 linear feet of 48-inch storm drain, catch basins,
maintenance holes, laterals, and associated improvements at Collier and Winnetka. This project will alleviate frequent
flooding of the road and will improve safety of vehicle and pedestrian traffic by preventing the accumulation of water.
WQ Haynes Green Street D $ 250,000
Funding is provided by the Measure W Local Return Fund for the construction of a low flow diversion structure with
pump to divert dry weather flow to the sewer and the installation of green elements at a vacant lot adjacent in a
residential area.
WQ Herman Dog Park Stormwater Enhancement C $ 2,162,311
(aka Arroyo Seco Urban Runoff Project No. 2 -
AS-21)
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a storm drain in
a 200 acre drainage area at Avenue 59 at Via Marisol to be pumped into an existing sewer main located in Via Marisol
east of the 110 freeway.
WQ La Cienega Green Street D $ 250,000
Funding is provided by the Measure W Local Return Fund for the installation of stormwater capture, permeable
features and community enhancements to capture and infiltrate stormwater runoff along a 0.45-mile stretch of La
Cienega Blvd.
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.
811