Page 350 - FY 2021-22 Blue Book Volume 2
P. 350

CTIEP – Physical Plant

            STREET PROJECTS (continued)

            CATEGORY*       PROJECT TITLE                            ACTIVITY**                          2021-22 AMOUNT

                 M          Pedestrian Lights and Safety Improvements     C                           $        5,000,000
                            Including Flashing Beacons, Crosswalks,
                            Speed Feedback Signs, and Other Projects

            Funding is provided for the implementation of pedestrian lights and safety improvement projects, including flashing
            beacons, crosswalks, speed feedback signs, and other projects Citywide. The following 13 projects shall be given
            priority from the funding allotment: 1) Ben Ave. and Victory Blvd. Pedestrian Hybrid Beacons/High-Intensity Activated
            Crosswalk  (PHB/HAWK) – New Crosswalk; 2) Burbank Blvd. and Saint Clair Ave. PHB/HAWK – Existing Crosswalk;
            3) Califa Street and Vineland Ave. PHB/HAWK - Existing Crosswalk; 4) Lankershim Blvd. and Valley Spring Lane
            PHB/HAWK – Existing Crosswalk; 5) Laurel Canyon Blvd. and Valerio Street PHB/HAWK – New Crosswalk; 6)
            Magnolia Blvd. and Wilkinson Ave. Pedestrian Activated Yellow Flashing Beacons (PAYFB) – Existing Crosswalk; 7)
            Beverly Blvd. Traffic Speed Digital Sign; 8) Lankershim Blvd./Neenach Street Crosswalk/Pedestrian Beacon; 9) Hybrid
            Crosswalk at Arminta and Lankershim intersection; 10) Glenoaks Blvd. Crosswalk/Sidewalk; 11) Foothill Blvd. Hybrid
            Beacon Crosswalk/Sidewalk Improvement; 12) Elysian Valley Pedestrian Crosswalk Improvements; and, 13) East
            Hollywood Pedestrian Safety Project.

                 M          Pedestrian Tunnel Closure at 52nd and         C                               $    500,000
                            Hoover and 60th and Figueroa
            Funding is provided for the closure of the pedestrian tunnels to ensure public safety.

                 M          Pedestrian Tunnel Closure at W. 111 Street    C                               $    265,000
                            and S. Figueroa Street

            Funding is provided for the closure of the pedestrian tunnel to ensure public safety.

                 M          Reservoir Street (1921 W.) Bulkhead           C                          $       911,000
                            Replacement

            Funding is provided by the SB1 Fund to replace an existing failing timber bulkhead with a new steel pile and concrete
            lagging bulkhead to restore lateral support and safety to the roadway.

                 M          Safety Related Drainage Projects              C                                $       388,000

            Funding is provided by the SB1 Fund to correct drainage problems in City streets primarily caused by aged and worn
            gutters, cross-gutters, and curbs.
                 M          Sepulveda Blvd. (LAX) Tunnel Safety           C                          $       294,500
                            Maintenance and Cleaning

            Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.

                 M          Sherman Way Tunnel Safety Maintenance         C                                $     115,700

            Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.

                 M          Slauson Ave. Improvements from Crenshaw       C                                $     2,000,000
                             Blvd. to Western

            Funding is provided by the SB1 Fund for street improvements, including reconstructing failing asphalt concrete
            pavement, improving curb and gutter, improving non-ADA compliant curb ramps and sidewalks, implementing a bike
            lane and improving the surface drainage.
            * "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
            ** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.