Page 350 - FY 2021-22 Blue Book Volume 2
P. 350
CTIEP – Physical Plant
STREET PROJECTS (continued)
CATEGORY* PROJECT TITLE ACTIVITY** 2021-22 AMOUNT
M Pedestrian Lights and Safety Improvements C $ 5,000,000
Including Flashing Beacons, Crosswalks,
Speed Feedback Signs, and Other Projects
Funding is provided for the implementation of pedestrian lights and safety improvement projects, including flashing
beacons, crosswalks, speed feedback signs, and other projects Citywide. The following 13 projects shall be given
priority from the funding allotment: 1) Ben Ave. and Victory Blvd. Pedestrian Hybrid Beacons/High-Intensity Activated
Crosswalk (PHB/HAWK) – New Crosswalk; 2) Burbank Blvd. and Saint Clair Ave. PHB/HAWK – Existing Crosswalk;
3) Califa Street and Vineland Ave. PHB/HAWK - Existing Crosswalk; 4) Lankershim Blvd. and Valley Spring Lane
PHB/HAWK – Existing Crosswalk; 5) Laurel Canyon Blvd. and Valerio Street PHB/HAWK – New Crosswalk; 6)
Magnolia Blvd. and Wilkinson Ave. Pedestrian Activated Yellow Flashing Beacons (PAYFB) – Existing Crosswalk; 7)
Beverly Blvd. Traffic Speed Digital Sign; 8) Lankershim Blvd./Neenach Street Crosswalk/Pedestrian Beacon; 9) Hybrid
Crosswalk at Arminta and Lankershim intersection; 10) Glenoaks Blvd. Crosswalk/Sidewalk; 11) Foothill Blvd. Hybrid
Beacon Crosswalk/Sidewalk Improvement; 12) Elysian Valley Pedestrian Crosswalk Improvements; and, 13) East
Hollywood Pedestrian Safety Project.
M Pedestrian Tunnel Closure at 52nd and C $ 500,000
Hoover and 60th and Figueroa
Funding is provided for the closure of the pedestrian tunnels to ensure public safety.
M Pedestrian Tunnel Closure at W. 111 Street C $ 265,000
and S. Figueroa Street
Funding is provided for the closure of the pedestrian tunnel to ensure public safety.
M Reservoir Street (1921 W.) Bulkhead C $ 911,000
Replacement
Funding is provided by the SB1 Fund to replace an existing failing timber bulkhead with a new steel pile and concrete
lagging bulkhead to restore lateral support and safety to the roadway.
M Safety Related Drainage Projects C $ 388,000
Funding is provided by the SB1 Fund to correct drainage problems in City streets primarily caused by aged and worn
gutters, cross-gutters, and curbs.
M Sepulveda Blvd. (LAX) Tunnel Safety C $ 294,500
Maintenance and Cleaning
Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.
M Sherman Way Tunnel Safety Maintenance C $ 115,700
Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.
M Slauson Ave. Improvements from Crenshaw C $ 2,000,000
Blvd. to Western
Funding is provided by the SB1 Fund for street improvements, including reconstructing failing asphalt concrete
pavement, improving curb and gutter, improving non-ADA compliant curb ramps and sidewalks, implementing a bike
lane and improving the surface drainage.
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.