CTIEP – Physical Plant

            STREET LIGHTING PROJECTS

            The capital improvements listed in this section are funded from the General Fund, Special Gas Tax Improvement Fund,
            SB1 Road Maintenance and Rehabilitation Fund, and Measure M Local Return Fund.

            CATEGORY*              PROJECT TITLE                     ACTIVITY**                          2021-22 AMOUNT

                 SL         Architectural Lighting Maintenance            C                              $         50,000

            Funding is provided to repair or replace architectural lighting for bridges, statues, trees, walls underpasses, medians,
            and other sites Citywide.

                 SL         Bikeway General Benefit Maintenance           C                              $         150,000

            Funding is provided by the Special Gas Tax Improvement Fund for bikeway lighting maintenance, including
            replacement of copper wire due to theft.

                 SL         Bridge and Tunnel Lighting Maintenance        C                              $         100,000

            Funding is provided by the Special Gas Tax Improvement Fund for the maintenance and operation of bridge and tunnel
            lighting within the City.

                 SL         Intersection Improvement Unit 16 STM/STP      C                              $          480,000
                             Vision Zero Improvements

            Funding is provided by the Measure M Local Return Fund to upgrade or replace existing street lighting equipment (may
            include traffic equipment) at intersections. Work includes installation of new conduit, wires and luminaires.

                 SL         High Voltage Conversion Program - Materials   C                              $         1,280,000

            Funding is provided by the SB1 Fund for materials for the conversion of 800 series high voltage lighting units to low
            voltage LED, including circuit breakers as part of the Accelerated High Voltage Conversion Program to lower voltage.

                 SL         Olympic Blvd. from Lake Street to Western Ave.  C                            $         3,500,000
                            CIP/STP

            Funding is provided by the SB1 Fund to convert the existing high voltage series street lighting system to a low voltage
            system, including refurbishing existing poles and installing new conduit, wires, and energy efficient LED lighting).

                 SL         Security Lighting Unit 21                     C                              $         495,000

            Funding is provided by the SB1 Fund to install modern pedestrian lighting systems at select bus stop locations to meet
            lighting standards for pedestrian traffic.

                 SL         Stairway and Walkway Lighting Unit 18         C                         $        400,000
                            CIP/STP

            Funding is provided to upgrade or install new pedestrian lighting on stairways and walkways, including tunnels and
            underpasses.

                 SL         Street Lighting at Existing Pedestrian        C                              $         500,000
                            Crosswalks – Vision Zero

            Funding is provided by the Measure M Local Return Fund to install new street lighting at intersections in conjunction
            with new signal and signal modification projects.

            * "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
            ** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.