Page 351 - FY 2021-22 Blue Book Volume 2
P. 351
CTIEP – Physical Plant
STREET PROJECTS (continued)
CATEGORY* PROJECT TITLE ACTIVITY** 2021-22 AMOUNT
M Speed Humps C $ 1,000,000
Funding is provided to install speed humps across the City.
M Sunset Blvd. Phase 2 – Coronado Terrace to C $ 3,489,000
Waterloo Street
Funding is provided by the SB1 Fund to install a shotcrete and soil nail wall to mitigate the over-steepened slope, and
drainage. This project will secure the slope from rockfall and erosion to ensure pedestrian and vehicular safety.
M Sunset Blvd. Phase 3 – Coronado Terrace to C $ 5,097,000
Waterloo Street
Funding is provided by the SB1 Fund to install a shotcrete and soil nail wall to mitigate the over-steepened slope, and
drainage. This project will secure the slope from rockfall and erosion to ensure pedestrian and vehicular safety
M Sunset Blvd. Phase 4 – Coronado Terrace to D $ 372,000
Waterloo Street
Funding is provided by the SB1 Fund to install a shotcrete and soil nail wall to mitigate the over-steepened slope, and
drainage. This project will secure the slope from rockfall and erosion to ensure pedestrian and vehicular safety
M Tonopah Street Tunnel Under the I-5 and C $ 130,000
I-170 Freeways
Funding is provided for the closure of the pedestrian tunnel at Tonopah Street under the I-5 and SR-170 freeways to
abate the public safety issues occurring at this site. The Tonopah Street Pedestrian tunnel is under the Caltrans
jurisdiction. The scope of work includes installing a locked wrought iron fence at each entrance.
M Ventura Canyon/Strathern Street Improvement C $ 1,631,000
Funding is provided to design and construct the Strathern Street to local street level with 60 foot right of way, 36 foot
roadway and 12 foot sidewalk, including installing new street lights, street trees, landscaping, and any additional
improvements.
M Verde Street (2401) Remedial Slope Mitigation C $ 1,396,000
Funding is provided by the General Fund ($1,128,841) and the SB1 Fund ($267,159) to install a new steel pile and
concrete lagging bulkhead to provide lateral support to the roadway.
M Victory Blvd. Street Reengineering C $ 1,500,000
Funding is provided for improvements along Victory Blvd.
M Wade Street (3640) D $ 105,000
Funding is provided for design to correct the water flow on Wade Street in Mar Vista where water is pooling daily in the
street in front of multiple properties in both dry and wet weather.
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.
817