Page 347 - FY 2021-22 Blue Book Volume 2
P. 347

CTIEP – Physical Plant

            STREET PROJECTS

            The capital improvements listed in this section are funded from the General Fund, Special Gas Tax Improvement Fund,
            SB1 Fund, and Measure M Local Return Fund.

            CATEGORY*             PROJECT TITLE                      ACTIVITY**                            2021-22 AMOUNT

                 M          2nd Street Tunnel Rehabilitation              D                          $      600,000

            Funding is provided by the SB1 Fund for the design of the construction document, removal of the existing tiles, and
            replacement of the existing drainage system to ensure safety of traffic within the tunnel.

                 M          2nd Street Tunnel Safety Maintenance and      C                                $         65,900
                            Cleaning

            Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.

                 M          3rd Street Tunnel Safety Maintenance and      C                                $          70,400
                            Cleaning

            Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.

                 M          Alley Paving                                  C                               $        1,000,000
            Funding is provided for paving alleys across the City. The following six projects shall be provided priority from the
            allotment: 1) Alley – West of Barring Cross Street between 88th and 90th Street; 2) Alley – South of 93rd Street from
            Wall to Alley East of Main St.; 3) Alley – South of 85th Street between Cimarron and Van Ness; 4) Alley – Concordia
            Walk between Gramercy and Ruthelen; 5) Alley – West of Crenshaw from Vernon to 48th Street; and, 6) Alley – East
            of Overhill Dr. between 62nd Street and 63rd Street.

                 M          Argo Drain Sub-Basin Project – Mitigation     C                               $           29,025
                            Credit Purchase

            Funding is provided to purchase a mitigation credit to comply with a permit issued by Los Angeles Regional Water
            Quality Control Board to mitigate 0.06 acres of habitat that was disturbed by the Argo Drain Sub-Basin Project.

                     M                 Balboa Widening at Devonshire Street           C                                           $          330,000

            Funding is provided by the Measure M Local Return Fund to widen the east side of Balboa Blvd. for approximately 0.1
            mile south of the intersection of Balboa Blvd. and Devonshire Street and reduce the existing sidewalk on the east side
            of Balboa by 3 feet. Improvements include the construction of asphalt concrete pavement, concrete curb and gutter,
            concrete sidewalks, curb ramps, driveways, stormdrains, and street repair.

                     M                 Bridge and Tunnel Maintenance Program           C                                           $          358,000

            Funding is provided by the SB1 Fund for maintenance of City bridges and tunnels as identified by the City and
            California Department of Transportation bridge inspectors.

                     M                Contingency for Construction                                 C                                             $       500,000

            Funding is provided by the General Fund ($100,000) and the SB1 Fund ($400,000) for unanticipated shortfalls and
            other capital needs during the fiscal year.





            * "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
            ** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.


                                                             813
   342   343   344   345   346   347   348   349   350   351   352