             STORMWATER PROJECTS
             In  2021-22, funds are provided from the General Fund  $         10,480,897   $           23,617,414
             ($3,000,000), Measure W Local Return Fund ($13,548,180), and
             SB1 Fund ($7,069,234) for three flood control projects and 11
             water quality improvement projects.

                                            Total – Stormwater Projects  $         10,480,897   $           23,617,414


             STREET PROJECTS

             Street Repair and Pedestrian Improvement                   $         19,507,390   $           49,611,487

             In  2021-22, funds are provided from the General Fund
             ($29,529,866), Special Gas Tax Improvement Fund ($200,000),
             SB1 Fund ($19,501,621), and Measure M Local Return  Fund
             ($380,000) for public safety street  improvements,  hillside
             stabilization projects, pedestrian safety projects,  and  the
             reconstruction of streets that are extensively deteriorated.

             Contingencies                                              $              500,000   $               500,000

             Funds are provided from the General Fund ($100,000) and the
             SB1 Fund ($400,000) for eligible Physical Plant projects. The City
             Administrative Officer may approve transfers from the
             Contingencies Account to any project previously approved by the
             Mayor and Council within the CTIEP.

                                                 Total – Street Projects  $         20,007,390   $          50,111,487

             STREET LIGHTING PROJECTS

             In 2021-22, funds are provided from the General Fund ($450,000),  $           1,500,000   $             9,780,000
             Special  Gas  Tax  Improvement Fund ($250,000), SB1 Fund
             ($7,975,000), and the Measure M Local Return Fund ($1,105,000)
             for general benefit street lighting improvement, for maintenance
             and replacement of existing general benefit lighting,  and  for
             conversion of high voltage lighting system to low voltage system.

                                         Total – Street Lighting Projects  $           1,500,000   $             9,780,000


                               CAPITAL AND TECHNOLOGY IMPROVEMENT  $         31,988,287    $           83,508,901