Page 358 - 2022-23 Blue Book Vol 2
P. 358

Capital Finance Administration Fund


            32. ELECTRIC  VEHICLES INFRASTRUCTURE FOR YARDS  AND FACILITIES  —  Funding  is  provided  for  the
               development of electric vehicle infrastructure at yards operated by the Bureau of Street Services in preparation for
               the full electrification of all City fleet vehicles.
            33. ENGINE COMPANY 23 JUNIOR ARTS CENTER — Funding is provided to address a funding shortfall for this
               Proposition K specified project to repurpose the former fire station into a Junior Arts facility located on Skid Row
               that would serve people experiencing homelessness and other disadvantaged youths.

            34. FIRE STATION  ALERTING SYSTEM REPLACEMENT — Funding is provided to offset a shortfall for the Fire
               Station Alerting System replacement project.

            35. FIRE STATION NO. 4 FACADE REPLACEMENT — Funding is provided to offset a funding shortfall for the Fire
               Station No. 4 Facade Replacement project to implement repairs and reconstruction of the exterior facade.

            36. FIRE STATION NO. 39 IMPROVEMENTS  —  Funding  is  provided  to  continue  improvements  at  the  Old  Fire
               Station No. 39 in order to provide a permanent location for the Operations Valley Bureau. Improvements include
               the renovation of the kitchen area and an Americans with Disabilities Act (ADA) restroom.

            37. FUEL MANAGEMENT SYSTEM UPGRADE - PHASE II — Funding is provided for Phase II upgrades to the Fuel
               Management System, including the installation of 170 fuel control terminals.

            38. HARBOR LSD REGIONAL FACILITY  —  Phased  funding  is  provided  to  retrofit  an  area  within  an  existing
               masonry building at the Harbor yard for use by the LSD to house administrative staff who are currently using a
               temporary office trailer at the site.
            39. HOLLYWOOD RECREATION CENTER PHASE II - MODERN GYMNASIUM — Funding is provided to address a
               funding shortfall to proceed with the replacement of the existing gymnasium with a modern facility as part of a
               final phase of the Proposition K specified project authorized for this facility.

            40. LANKERSHIM  ART CENTER IMPROVEMENTS  AND HABITABILITY REPAIRS  —  Funding  is  provided  for
               improvements and repairs to the Lankershim Arts Center.

            41. MEND BUILDING  RENOVATION  —  Funding  is  provided  for  renovation  of  MEND  building  facility's  building
               systems as a result of vandalism.

            42. MUNICIPAL BUILDINGS ENERGY  AND WATER  MANAGEMENT  AND CONSERVATION  —  Funding  is
               provided  for  required  energy  audits,  engineering,  and  retrofit  work  at  City  facilities  to  meet  energy  and  water
               conservation goals.

            43. NORTH CENTRAL ANIMAL SHELTER KENNEL REPAIR/RENOVATION  —  Funding  is  provided  to  repair  a
               section  of  kennels  at  the  North  Central  Animal  Shelter  that  is  separating  from  the  walls,  which  is  impacting
               operations.
            44. NORTH HOLLYWOOD PARK REDESIGN — Funding is provided for the redesign of the North Hollywood Park.

            45. OLD  ARLINGTON (WASHINGTON IRVING)  LIBRARY  —  Funding  is  provided  to  address  initial  construction
               activities for the historic former Old Washington Irving library building.

            46. PARKING LOTS 2 AND 7 REDESIGN — Funding is provided for the reconfiguration of Parking Lots 2 and 7 in
               Downtown Los Angeles, including relocation of the parking booth, communications, electrical, and other parking
               infrastructure  to  ensure  public  and  City  employee  access  to  the  maximum  parking  possible  during  and  after
               construction of the expanded Go For Broke affordable housing development. The redesign will enable expansion
               of the development to 245 units of supportive and affordable housing.

            47. PIO PICO LIBRARY  POCKET PARK  AND UNDERGROUND PARKING  —  Funding  is  provided  to  construct
               pocket park features, including a children's shade structure, perimeter fencing, and library facade treatments.

            48. PUBLIC  SAFETY FACILITIES  -  ANIMAL SERVICES  —  Funding  is  provided  to  support  ongoing  capital
               improvements at various Animal Services facilities.

            49. PUBLIC SAFETY FACILITIES - FIRE — Funding is provided to support ongoing capital improvements at various
               Fire Department facilities.

            50. PUBLIC SAFETY FACILITIES  -  POLICE  —  Funding  is  provided  to  support  ongoing  capital  improvements  at
               various Police Department facilities.
                                                             894
   353   354   355   356   357   358   359   360   361   362   363