Page 527 - FY 2020-21 Blue Book Volume II
P. 527

Street Improvement



                                                      Complete Streets Program

                                                            2018-19             2019-20
                                                            Interim             Interim
                                      2017-18    2018-19   Appropriation   2019-20   Appropriation   2020-21
                    Funding Source    Adopted    Adopted    Change   Adopted    Change    Proposed    Total
                      SB1/RMRA      $       1,500,000 $    23,561,000  $    1,423,954   $                -  $     26,484,954
                        SDRF        $                 -  $    10,000,000 $     (8,174,061) $ 20,500,000 $    (20,500,000) $                -  $      1,825,939
                BSS Dept. Appr (Measure M)     $      3,201,342     $    3,358,019      $      2,946,801
                      Measure M     $       5,115,046 $      9,000,000  $    5,333,000             $     19,448,046
                      Measure W     $                 -  $               -  $    3,667,000  $      2,400,000 $      3,667,000
                                Total $       6,615,046 $    45,762,342 $     (8,174,061) $ 34,281,973 $    (20,500,000) $      5,346,801 $     63,332,101

               The six projects included in the Complete Streets Program are listed below.  They are currently in various
               stages of completion.  The total cost for all six projects is $87,524,000.  An additional $24,191,899 will need
               to be identified in future budgets to complete the Reseda and Avalon projects.

                      Roscoe Blvd from the I-405 to Woodman Ave ($8.6 million) – Complete
                      Venice Blvd (East) from Arlington Ave to Figueroa St ($13.6 million) – Complete
                      Main Street (South) from MLK Blvd to Imperial Hwy ($13.9 million) – In Construction
                      Temple Ave from Beverly Blvd to Beaudry Ave ($9.2 million) – Complete
                      Reseda Blvd from Parthenia St to Victory Blvd ($24.7 million) – In Design
                      Avalon Blvd from San Pedro St to 120  St ($17.5 million) – In Design
                                                        th

               The next projects within the Complete Streets Program are listed below. Preliminary funding was provided
               in 2018-19 to begin the design of a portion of these projects, with additional funding for construction to be
               provided in future years, subject to available resources.

                      Beverly Blvd from Normandie Pl to Westmoreland Ave
                      Culver Blvd from Centinela Ave to Slauson Ave
                      Highland Ave from Santa Monica Blvd to Franklin Ave
                      La Brea Ave from Coliseum St to Adams Blvd
                      La Cienega Blvd from Guthrie Ave to Whitworth Dr
                      Lankershim Blvd from Califa St to Victory Blvd
                      Manchester Ave from Vermont Ave to McKinley Pl
                      Normandie Ave from Beverly Blvd to Melrose Ave
                      Pacific Ave from Rose Ave to N Venice Blvd
                      Van Nuys Blvd from Beachy Ave to Vesper Ave
                      Vermont Ave from 7  Street to Beverly Blvd
                                        th
                      Victory Blvd from Fulton Ave to Whitsett Ave