Page 88 - FY 2020-21 Blue Book Volume II
P. 88

Delete funding for 232 resolution authority positions. One
                position was approved during 2019-20. Resolution authorities
                are reviewed annually and continued only if sufficient funding
                is available to maintain the current service level.  Related
                costs consist of employee benefits.
                70 positions are continued as regular positions:
                Support for Plan Check Activities (Six positions)
                Expedited B-Permit Reviews (Seven positions)
                Citywide B-Permit Case Management Group (Nine positions)
                Clean Water Capital Improvement Program Support (Eight
                positions)
                Design Construction Management for Treatment Plants (Two
                positions)
                Construction Management for Sewers (Four positions)
                Emergency Sewer Repair and Rehabilitation Projects (10
                positions)
                Pavement Preservation Program Support (Seven positions)
                Street Improvement Projects Support (Three positions)
                Survey Support for Street Improvement Projects (Four
                positions)
                Sidewalk Repair Program (Eight positions)
                Engineering Database Enhancement (One position)
                Executive Administrative Support (One position)
                148 positions are continued:
                Environmental Management Group Support (Two positions)
                Structural Plan Checking of Private Development Projects
                (Two positions)
                Customer Service for Land Development and GIS (Three
                positions)
                Above Ground Facilities and Utility Permits Support (Six
                positions)
                Support for Sidewalk Dining (One position)
                Public Right of Way Reservation System (One position)
                Utility Permit Warranty Program (One position)
                LAWA Landside Access Modernization Program (Three
                positions)
                LAWA Structural and Permit Plan Review (Four positions)
                Emergency Sewer Repair Program Support (One position)
                Enhanced Watershed Management Projects Support (Five
                positions)
                Clean Water Program Support (Two positions)
                Department of Water and Power Stormwater Capture (Two
                positions)
                Metro Annual Work Program (28 positions)
                Transportation Grant Annual Work Program (22 positions)
                Active Transportation Program Delivery (Eight positions)
                Transportation Construction Traffic Management (One
                position)
                Vision Zero (Two positions)
                Traffic Signals Program (Three positions)                               Bureau of Engineering
                Affordable Housing and Sustainable Communities Grant
                (Three positions)  Program Changes                          Direct Cost  Positions   Total Cost
                Seventh Street Streetscape Project (One position)
           Changes in Salaries, Expense, Equipment, and Special
                Zelzah Avenue Improvements Project (One position)
                Broadway Streetscape Plan (One position)
           Deletion of One-Time Services
                Grant Funded Projects Support (10 positions)
                Failed Streets Reconstruction (Six positions)
                ADA Coordinator for Sidewalk Repair Program (One position)
                Complete Streets Program (Eight positions)
                City Hall East Electrical Upgrades (One position)
                Electric Vehicle and Solar Power Engineering (Two positions)
                Los Angeles River Design and Project Management (Three
                positions)
                Sixth Street Viaduct Engineering Projects (Two positions)
                Recreation and Parks Project Support (One position)
                Pio Pico Library Pocket Park (One position)
                Potrero Canyon Park Project Support (Two positions)
                Bridge Home Program Support (Two positions)
                City Homeless Facilities Services (One position)
                Los Angeles Street Civic Building (Three positions)
                Fire and Animal Shelter and Homeless Facilities Projects
                (Two positions)
                One position approved during 2019-20 is continued as a
                regular position:
                Street Improvement Projects Support (One position)
                14 positions are not continued:
                Bridge Home Program Support (One position)
                City Homeless Facilities (One position)
                Los Angeles Street Civic Building (Four positions)
                Fire and Animal Shelter and Homeless Facilities Projects
                (Four positions)
                Asphalt Plant (One position)
                Construction Management Staffing (Two positions)
                Civic Center Master Plan Environmental Impact Study (One
                position)
                SG: ($21,014,984)
                Related Costs: ($9,107,143)
             9. Deletion of One-Time Salary Funding                          (2,135,595)         -    (2,801,047)
                Delete one-time Salaries, General funding. Related costs
                consist of employee benefits.
                SG: ($2,135,595)
                Related Costs: ($665,452)
           Restoration of Services
            10. Restoration of One-Time Expense Funding                         347,893          -       347,893
                Restore funding in the Overtime General, Contractual
                Services, Transportation, Office and Administrative, and
                Operating Supplies accounts on a one-time basis in the
                2019-20 Adopted Budget.
                SOT: $50,000   EX: $297,893
                                                             554
   83   84   85   86   87   88   89   90   91   92   93