Street Improvement
COMPLETE STREETS PROGRAM
The Complete Streets Program combines the reconstruction of failed streets with the installation of safety
measures, repair of damaged curbs, gutters, sidewalks, and installation of stormwater capture infrastructure.
The Complete Streets Program was created in 2017-18, funded through new sources of City revenue that
year. The following table represents Complete Streets Program funding to date by funding source:
Complete Streets Program - Round 1
2018-19 2019-20
Interim Interim 2020-21 Interim
2017-18 2018-19 Appropriation 2019-20 Appropriation 2020-21 Appropriation 2021-22 2022-23
Funding Source Adopted Adopted Change Adopted Change Adopted Change Adopted Proposed Total
SB1/RMRA $ 1,500,000 $ 23,561,000 $ - $ 1,423,954 $ - $ - $ 2,400,000 $ 3,820,000 $ 9,429,650 $ 42,134,604
SDRF $ - $ 10,000,000 $ (8,174,061) $ 20,500,000 $ (20,500,000) $ - $ - $ - $ - $ 1,825,939
BSS Dept. Appr (Measure M) $ - $ 3,201,342 $ - $ 3,358,019 $ - $ 2,946,801 $ - $ 3,169,585 $ 3,433,600 $ 16,109,347
Measure M $ 5,115,046 $ 9,000,000 $ - $ 5,333,000 $ - $ 2,400,000 $ (2,400,000) $ 2,400,000 $ - $ 21,848,046
Measure W $ - $ - $ - $ 3,667,000 $ - $ - $ - $ - $ - $ 3,667,000
Total $ 6,615,046 $ 45,762,342 $ (8,174,061) $ 34,281,973 $ (20,500,000) $ 5,346,801 $ - $ 9,389,585 $ 12,863,250 $ 85,584,936
The six projects included in the Complete Streets Program are listed below. They are currently in various
stages of completion. The total cost for all six projects is $87,524,000. An additional $1,939,064 will need to
be identified in future budgets to complete the Avalon project.
• Roscoe Blvd from the I-405 to Woodman Ave ($8.6 million) – Complete
• Venice Blvd (East) from Arlington Ave to Figueroa St ($13.6 million) – Complete
• Main Street (South) from MLK Blvd to Imperial Hwy ($13.9 million) – Complete
• Temple Ave from Beverly Blvd to Beaudry Ave ($9.2 million) – Complete
• Reseda Blvd from Parthenia St to Victory Blvd ($24.7 million) – In Construction
• Avalon Blvd from San Pedro St to 120 St ($17.5 million) – In Construction
th
BICYCLE LANE REPAIR AND MAINTENANCE
2022-23 Bicycle Lane Repair and Maintenance
Funding Source Amount
Measure R - Special Purpose Fund Appropriation $ 3,679,109
SDRF - Special Purpose Fund Appropriation $ 470,608
Total Proposed for Bicycle Lane Repair and Maintenance $ 4,149,717
Bicycle Lane repair and maintenance includes Citywide bike lane repair and maintenance to ensure public
safety. Repairs can be either in the bicycle lane only or the entire street segment. These repairs or
maintenance activities can include the following:
• Concrete
• Asphalt
• Slurry
• Resurfacing
• Reconstruction
• Pavement Markings
• Signage