CIEP – Physical Plant

            STORMWATER PROJECTS

            The capital improvements listed in this section are funded from the Measure W Local Return Fund, the SB1 Fund, and
            the Stormwater Pollution Abatement Fund.
            CATEGORY*             PROJECT TITLE                      ACTIVITY**                 2020-21 AMOUNT

                 WQ         Arroyo Seco Urban Runoff Project No. 1        D                               $        625,000

            Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a 200 acre
            drainage area at Sycamore Grove Park to be pumped into an existing 42-inch sanitary sewer main nearby.
                 WQ         Arroyo Seco Urban Runoff Project No. 2        D                               $     1,607,500

            Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a storm drain in
            a 200 acre drainage area at Avenue 59 at Via Marisol to be pumped into an existing sewer main located in Via Marisol
            east of the 110 freeway.

                 FC         Century Blvd and Gramercy Place               D                               $     1,063,125
                            Storm Drain


            Funding is provided by the SB1 Fund for the construction of 2400 linear feet of 24-inch diameter storm drain along
            Century Blvd, from Van Ness Ave and Gramercy Place.  This project will alleviate flooding and improve safety of
            vehicle and pedestrian traffic.

                 FC         Kittyhawk Greenway                            C                              $        482,765

            Funding is provided  by the Stormwater Pollution Abatement  Fund  for the implementation of green stormwater
            infrastructure in Westchester between West 85  Place, Kittyhawk Ave, and Wiley Post Ave.
                                                     th
                 WQ         LAR Segment B Urban Runoff Project No. 1      D                              $      1,250,000

            Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a 13 foot box
            storm drain along 2nd St by installing a installing a diversion weir and drop inlet into a low flow diversion structure. The
            diverted flow will be pumped into an existing 22-inch sanitary sewer main in Alameda Street.

                 WQ         LAR Segment B Urban Runoff Project No. 2      D                              $      1,250,000

            Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from two
            perpendicular storm drains in Palmetto Street and Santa Fe Avenue by installing diversion weirs and drop inlets into a
            low flow diversion. The diverted flow will be pumped into an existing sanitary sewer located at the intersection of Santa
            Fe Avenue and Palmetto Street.

                 WQ         LAR Segment B Urban Runoff Project No. 3      D                              $      1,713,440

            Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from two parallel
            storm drains in Elliot Street by installing a diversion weir and drop inlet into a low flow diversion. The diverted flow will
            be pumped into an existing 27-inch sanitary sewer located at the intersection of the 101 freeway and Mission Road.

                 FC         Sepulveda Blvd – 89  St to La Tijera Blvd     C                               $     1,153,500
                                               th
            Funding is provided by the SB1 Fund for the construction of 550 linear feet of 36-inch diameter storm drain, catch
            basins, and laterals along Sepulveda Blvd from 89  St to La Tijera Blvd. This project will alleviate flooding and improve
                                                       th
            safety of vehicle and pedestrian traffic.



             * "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
             ** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.