CIEP – Physical Plant
STORMWATER PROJECTS
The capital improvements listed in this section are funded from the Measure W Local Return Fund, the SB1 Fund, and
the Stormwater Pollution Abatement Fund.
CATEGORY* PROJECT TITLE ACTIVITY** 2020-21 AMOUNT
WQ Arroyo Seco Urban Runoff Project No. 1 D $ 625,000
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a 200 acre
drainage area at Sycamore Grove Park to be pumped into an existing 42-inch sanitary sewer main nearby.
WQ Arroyo Seco Urban Runoff Project No. 2 D $ 1,607,500
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a storm drain in
a 200 acre drainage area at Avenue 59 at Via Marisol to be pumped into an existing sewer main located in Via Marisol
east of the 110 freeway.
FC Century Blvd and Gramercy Place D $ 1,063,125
Storm Drain
Funding is provided by the SB1 Fund for the construction of 2400 linear feet of 24-inch diameter storm drain along
Century Blvd, from Van Ness Ave and Gramercy Place. This project will alleviate flooding and improve safety of
vehicle and pedestrian traffic.
FC Kittyhawk Greenway C $ 482,765
Funding is provided by the Stormwater Pollution Abatement Fund for the implementation of green stormwater
infrastructure in Westchester between West 85 Place, Kittyhawk Ave, and Wiley Post Ave.
th
WQ LAR Segment B Urban Runoff Project No. 1 D $ 1,250,000
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from a 13 foot box
storm drain along 2nd St by installing a installing a diversion weir and drop inlet into a low flow diversion structure. The
diverted flow will be pumped into an existing 22-inch sanitary sewer main in Alameda Street.
WQ LAR Segment B Urban Runoff Project No. 2 D $ 1,250,000
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from two
perpendicular storm drains in Palmetto Street and Santa Fe Avenue by installing diversion weirs and drop inlets into a
low flow diversion. The diverted flow will be pumped into an existing sanitary sewer located at the intersection of Santa
Fe Avenue and Palmetto Street.
WQ LAR Segment B Urban Runoff Project No. 3 D $ 1,713,440
Funding is provided by the Measure W Local Return Fund for the interception of dry-weather flow from two parallel
storm drains in Elliot Street by installing a diversion weir and drop inlet into a low flow diversion. The diverted flow will
be pumped into an existing 27-inch sanitary sewer located at the intersection of the 101 freeway and Mission Road.
FC Sepulveda Blvd – 89 St to La Tijera Blvd C $ 1,153,500
th
Funding is provided by the SB1 Fund for the construction of 550 linear feet of 36-inch diameter storm drain, catch
basins, and laterals along Sepulveda Blvd from 89 St to La Tijera Blvd. This project will alleviate flooding and improve
th
safety of vehicle and pedestrian traffic.
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.
857