CIEP – Physical Plant

            STREET PROJECTS (cont.)

            CATEGORY*             PROJECT TITLE                      ACTIVITY**                 2020-21 AMOUNT

                 M          Guardrail Construction Program                C                                $         49,000

            Funding is provided by the SB1 Fund to construct guardrails as warranted to enhance the safety of vehicular, cyclist,
            and pedestrian traffic.

                 M          Inwood Drive (13375) Bulkhead                 C                                $         515,000

            Funding is provided by the SB1 Fund to install a new steel pile and concrete lagging bulkhead to restore lateral support
            and safety to the roadway.

                 M          La Brea Median Project                        C                                $       309,000

            Funding is provided by the SB1 Fund to demolish and reconstruct an existing median on La Brea Avenue.

                 M          Mannix Dr (8265-8275 and 8230) Bulkhead       C                          $      2,037,000
                            Replacement

            Funding is provided by the SB1 Fund to remove and replace deteriorating timber bulkheads with new steel pile and
            concrete lagging bulkheads at two locations to restore lateral support and safety to the roadway.

                 M          Mayo Street (985) Retaining Wall Replacement  C                          $      914,000

            Funding is provided to remove and replace a collapsed retaining wall.
                 M          Montana St and Allesandro St                  C                                $     1,014,555

            Funding is provided by the SB1 Fund to construct new sidewalks, curb ramps, and retaining walls on the north side of
            Montana Street to safely separate pedestrian and vehicular traffic.

                 M          Mulholland Drive (7382) Bulkhead              C                                $       658,000
                            Replacement

            Funding is provided by the SB1 Fund to replace a deteriorating timber bulkhead with a new steel and concrete
            bulkhead to restore lateral support and safety to the roadway.
                 M          Nevin Elementary School Safe Routes to        C                                $       140,000
                            School - Phase 2

            Funding is provided by the Measure M Local Return Fund for sidewalk repair and new curb ramps to provide safe
            passage and Americans with Disabilities Act (ADA) compliance for students attending Nevin Elementary School and
            Bunche High School.
                 M          Nordica Drive (930-934) Bulkhead              C                                $       527,000

            Funding is provided by the SB1 Fund to construct a new bulkhead to restore lateral support to the roadway.

                 M          North Atwater Multimodal Bridge               C                              $         693,314
                            over the Los Angeles River

            Funding is provided by the Measure M Local Return Fund to construct a new 320-ft long cable-stayed bridge to carry
            pedestrian, bicycle, and equestrian traffic.

               * "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
               ** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.