CIEP – Physical Plant



            STREET PROJECTS (cont.)

            CATEGORY*             PROJECT TITLE                      ACTIVITY**                 2020-21 AMOUNT

                 M          Oakdell Road (3180) Bulkhead                  C                                $       545,000

            Funding is provided by the SB1 Fund to construct a new concrete bulkhead to restore lateral support and safety to the
            roadway and to avoid a collapse of the public right of way onto a private residential property.

                 M          Olympic Blvd and Mateo Street Phase            C                                $      1,171,452
                            II Street Improvements

            Funding is provided by the SB1 Fund to supplement an existing grant funded project to widen an intersection and
            install curb ramps, traffic signals, street lighting, and striping. This improves traffic flow and increases safety.

                 M          Pacific View Trail (2849) Retaining Wall      C                                $       749,000
                            Replacement

            Funding is provided by the SB1 Fund to remove and replace a failing timber retaining wall with a new steel beam and
            concrete lagging debris structure to provide safe passage for pedestrians and vehicles.

                 M          Safe Routes to School Street Safety           C                                $      370,000
                            Improvements Phase I

            Funding is provided by the SB1 Fund to complete design and implementation of Safe Routes to School Phase I
            engineering treatments to improve safe passage for pedestrians and vehicles.

                 M          Safety Related Drainage Projects              C                                $       646,000

            Funding is provided by the SB1 Fund to correct drainage problems in City streets primarily caused by aged and worn
            gutters, cross-gutters, and curbs.

                 M          Sepulveda Blvd (LAX) Tunnel Fire Detection    C                                $       303,000
                            System Upgrade

            Funding is provided by the SB1 Fund to upgrade the Fire Detection System in the Sepulveda Tunnel to maximize
            public safety.

                 M          Sepulveda Blvd (LAX) Tunnel Cleaning and      C                                $       245,494
                            Safety Maintenance

            Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.

                 M          Sherman Way Tunnel Safety Maintenance         C                                $        105,887

            Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.

                 M          Sunset Blvd at Allenford Ave Slope Mitigation   C                              $       164,000
            Funding is provided by the SB1 Fund to install K-rail to protect the roadway and stormdrain from slough, sediment, and
            debris that causes flooding and to provide safe passage for vehicular traffic.





             * "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
             ** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.