Page 401 - FY 2020-21 Blue Book Volume II
P. 401
CIEP – Physical Plant
STREET LIGHTING PROJECTS
The capital improvements listed in this section are funded from the General Fund, SB1 Fund, and Measure M Local
Return Fund.
CATEGORY* PROJECT TITLE ACTIVITY** 2020-21 AMOUNT
SL Bikeway General Benefit Maintenance C $ 150,000
Funding is provided for bikeway lighting maintenance, including replacement of copper wire due to theft.
SL Bridge and Tunnel Lighting Maintenance C $ 100,000
Funding is provided for the maintenance and operation of bridge and tunnel lighting within the City.
SL Olympic Blvd-Lake St to Western Ave D $ 400,000
CIP/STP
Funding is provided by the SB1 Fund to replace the existing high voltage series street lighting system with a low
voltage system to improve safety.
SL Street Lighting at Existing Pedestrian C $ 500,000
Crosswalks – Vision Zero
Funding is provided by the Measure M Local Return Fund to install new street lighting at intersections in conjunction
with new signal and signal modification projects.
SL Wilshire Blvd-Grand Ave to Hoover St D $ 350,000
STM/STP
Funding is provided by the SB1 Fund to replace the existing high voltage series street lighting system with a low
voltage system to improve safety.
Subtotal Street Lighting Projects $ 1,500,000
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.