Page 397 - FY 2020-21 Blue Book Volume II
P. 397
CIEP – Physical Plant
STREET PROJECTS
The capital improvements listed in this section are funded from the General Fund, SB1 Fund, Measure M Local Return
Fund, and Street Damage Restoration Fee Fund.
CATEGORY* PROJECT TITLE ACTIVITY** 2020-21 AMOUNT
M 2nd Street Tunnel Cleaning and Safety C $ 59,175
Maintenance
Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.
M 2nd Street Tunnel Tile Removal and D $ 330,750
Drainage Control
Funding is provided by the SB1 Fund to repair cracking in the concrete tunnel, fix drainage issues, and remove loose
and falling ceramic tiles to ensure safety of traffic within the tunnel.
M 3rd Street Tunnel Cleaning and Safety C $ 63,675
Maintenance
Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.
M Berenice Place (3933) C $ 219,678
Funding is provided by the Street Damage Restoration Fee Fund to reconstruct the damaged street including curbs.
M Bridge and Tunnel Maintenance Program C $ 478,000
Funding is provided by the SB1 Fund for maintenance of City bridges and tunnels as identified by the City and Caltrans
bridge inspectors.
M Burbank Blvd-Lankershim Blvd to Cleon Ave C $ 2,200,511
Funding is provided by the Measure M Local Return Fund to widen Burbank Blvd including the addition of streetlights
and curb ramps.
M Contingency for Construction C $ 500,000
Funding is provided by the Special Gas Tax Improvement Fund for unanticipated shortfalls and other capital needs
during the fiscal year.
M Erosion Control for Hillside Damage C $ 200,000
Funding is provided by the SB1 Fund for emergency erosion control mitigation measures to protect streets and the
public right-of-way from critical damage and/or closure as a result of the impact of fire and flood damage, as needed.
M Fletcher Drive and La Cede Ave C $ 360,060
Funding is provided by the SB1 Fund to install handrails along Fletcher Drive through an underpass on both sides of
the roadway to safely separate pedestrian and vehicular traffic.
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.
859