CIEP – Physical Plant
STREET PROJECTS (cont.)
CATEGORY* PROJECT TITLE ACTIVITY** 2020-21 AMOUNT
M Sunset Blvd Phase 2 and 3-Coronado Terrace D $ 820,000
To Waterloo St
Funding is provided by the SB1 Fund to install a shotcrete and soil nail wall to mitigate the over-steepened slope and to
eliminate continuing erosion that creates unsafe conditions on the sidewalk and curbside traffic lane.
M Valley Blvd (3900 East) Remedial Slope C $ 200,000
Mitigation
Funding is provided by the SB1 Fund to install K-rail with wire mesh fencing against the slope, including near street
lights, to restore the width of the sidewalk for pedestrian safety due to erosion of the adjacent slope.
M Ventura Canyon and Strathern Ave C $ 1,114,893
Funding is provided by the SB1 Fund to reconstruct Strathern Street, including roadway, sidewalk, new streetlights,
trees, and landscape elements.
M Victory and Encino Intersection C $ 2,077,734
Funding is provided by the SB1 Fund to increase safety by repairing an unsafe dip in the roadway and installing a
traffic beacon.
M Woodlawn Ave Triangle Median Safety C $ 226,212
Improvements
Funding is provided by the SB1 Fund to supplement an existing project by adding curb extensions, curb ramps,
sidewalks, crosswalks, landscaping, and additional traffic control devices.
Subtotal Street Projects $ 20,007,390
* "FC" indicates Flood Control; "SL" indicates Street Lighting; "M" indicates Miscellaneous (e.g. soundwalls & bulkheads); "WQ" indicates Water Quality.
** “PP” indicates preliminary study. “D” indicates design. “C” indicates construction work. “R/W” indicates land or building acquisition.
862