Page 398 - 2022-23 Blue Book Vol 2
P. 398

CTIEP – Physical Plant



            STREETS PROJECTS (cont.)

            PROJECT TITLE                                         CATEGORY*  SEI*  GI*  ACTIVITY**    2022-23
                                                                                                      AMOUNT

            West Jefferson Blvd. (4521) – Bus Pad and Street          1,4,5      5    -      D      $       124,447
            Improvements
            Funding is provided by the Special Gas Tax Street Improvement Fund to remove and to replace a settled bus pad, and
            reconstruct the damaged curb and sidewalk to ensure public safety.

            Westshire Drive (2804) Bulkhead                            1,4       7    -      C      $       298,000
            Funding is provided by the SB1 Fund to construct approximately 32 linear feet of bulkhead consisting of cast-in-place
            steel beam and pre-cast concrete lagging to provide lateral support to the existing roadway and ensure public safety.

            Whitley Avenue (2032) Retaining Wall Replacement           1,4       7    -      C      $       796,000

            Funding is provided by the SB1 Fund to replace an existing failing concrete retaining wall with a new steel beam and
            pre-cast concrete lagging bulkhead to restore lateral support to the existing roadway and ensure public safety.

            Wilcox (1718 N.) Settlement Repair                         1,4       6    -      D      $         70,000

            Funding  is  provided  by  the  Special  Gas  Tax  Improvement  Fund  to  reconstruct an approximately 100-foot long
            damaged concrete roadway, sidewalk pavement, and curb and gutter to ensure public safety.

            Wilmington  Drain Habitat Restoration Mitigation and      2,3,5      6         PC      $    2,405,805
            Monitoring Plan Project

            Funding is provided for habitat restoration mitigation and monitoring activities as required by the permit issued by the
            California Department of Fish and Wildlife.

            Woodrow Wilson Drive (7040) Bulkhead                       1,4       8    -      C      $       924,000

            Funding is provided by the SB1 Fund to install a new steel beam and pre-cast concrete lagging bulkhead to provide
            lateral support to the existing roadway and to ensure public safety.

            Yuma Place (8320) Bulkhead                                 1,4       8    -      C      $    1,599,000

            Funding is provided by the SB1 Fund to construct approximately 130 linear feet of bulkhead to provide lateral support
            to the existing roadway and ensure public safety.

            Subtotal Street Projects                                                                $  90,680,937


















            * "1" Health & Safety, “2” Legal Mandate, “3” Resiliency and Sustainability, “4” Operations and Cost Savings, “5” Equitable Community and Economic
            Sustainability/Social Equity. “SEI” Social Equity Index (See CTIEP Summary for SEI definition). “GI” Green Investment.
            ** “PP” preliminary study. “D” design. “C” construction work. “R/W” land or building acquisition. “PC” post-construction.
                                                             934