CTIEP – Physical Plant
STREETS PROJECTS (cont.)
PROJECT TITLE CATEGORY* SEI* GI* ACTIVITY** 2022-23
AMOUNT
West Jefferson Blvd. (4521) – Bus Pad and Street 1,4,5 5 - D $ 124,447
Improvements
Funding is provided by the Special Gas Tax Street Improvement Fund to remove and to replace a settled bus pad, and
reconstruct the damaged curb and sidewalk to ensure public safety.
Westshire Drive (2804) Bulkhead 1,4 7 - C $ 298,000
Funding is provided by the SB1 Fund to construct approximately 32 linear feet of bulkhead consisting of cast-in-place
steel beam and pre-cast concrete lagging to provide lateral support to the existing roadway and ensure public safety.
Whitley Avenue (2032) Retaining Wall Replacement 1,4 7 - C $ 796,000
Funding is provided by the SB1 Fund to replace an existing failing concrete retaining wall with a new steel beam and
pre-cast concrete lagging bulkhead to restore lateral support to the existing roadway and ensure public safety.
Wilcox (1718 N.) Settlement Repair 1,4 6 - D $ 70,000
Funding is provided by the Special Gas Tax Improvement Fund to reconstruct an approximately 100-foot long
damaged concrete roadway, sidewalk pavement, and curb and gutter to ensure public safety.
Wilmington Drain Habitat Restoration Mitigation and 2,3,5 6 PC $ 2,405,805
Monitoring Plan Project
Funding is provided for habitat restoration mitigation and monitoring activities as required by the permit issued by the
California Department of Fish and Wildlife.
Woodrow Wilson Drive (7040) Bulkhead 1,4 8 - C $ 924,000
Funding is provided by the SB1 Fund to install a new steel beam and pre-cast concrete lagging bulkhead to provide
lateral support to the existing roadway and to ensure public safety.
Yuma Place (8320) Bulkhead 1,4 8 - C $ 1,599,000
Funding is provided by the SB1 Fund to construct approximately 130 linear feet of bulkhead to provide lateral support
to the existing roadway and ensure public safety.
Subtotal Street Projects $ 90,680,937
* "1" Health & Safety, “2” Legal Mandate, “3” Resiliency and Sustainability, “4” Operations and Cost Savings, “5” Equitable Community and Economic
Sustainability/Social Equity. “SEI” Social Equity Index (See CTIEP Summary for SEI definition). “GI” Green Investment.
** “PP” preliminary study. “D” design. “C” construction work. “R/W” land or building acquisition. “PC” post-construction.