Page 393 - 2022-23 Blue Book Vol 2
P. 393
CTIEP – Physical Plant
STREETS PROJECTS (cont.)
PROJECT TITLE CATEGORY* SEI* GI* ACTIVITY** 2022-23
AMOUNT
Contingency for Construction 1 - - C $ 1,000,000
Funding is provided by the General Fund ($250,000) and Special Gas Tax Street Improvement Fund ($750,000) for
unanticipated shortfalls and other capital needs during the fiscal year.
Crescent Drive (8483 & 8527) Bulkhead 1,4 8 - C $ 1,297,000
Funding is provided by the SB1 Fund to construct two steel pile and pre-cast concrete lagging bulkheads to restore
lateral support and ensure safety to the roadway.
Crescent Drive (8718, 8742, & 8764) Bulkheads 1,4 8 - C $ 1,772,000
Funding is provided by the SB1 Fund to construct two steel pile and pre-cast concrete lagging bulkheads to restore
lateral support and ensure safety to the roadway.
Dixie Canyon Avenue (6164) Bulkhead and Slope 1,4 8 - C $ 443,000
Stabilization
Funding is provided by the SB1 Fund to construct two steel pile and pre-cast concrete lagging bulkheads to restore
lateral support to the roadway and install k-rail with a debris barrier to protect the roadway from slough.
Dudley Drive Pavement Reconstruction 1,4 6 - C $ 500,000
Funding is provided by the Street Damage Restoration Fee Fund to reconstruct the asphalt concrete roadway to
improve drainage, widen the street width to enhance safety, and install new pavement and striping.
Erosion Control for Hillside Damage 1 - - C $ 400,000
Funding is provided by the General Fund ($200,000) and Special Gas Tax Street Improvement Fund for emergency
erosion control mitigation measures to protect damaged streets, right-of-way, and property from further erosion at
various sites throughout the City, as needed.
Foothill Blvd. (12061) and Pierce Street Tunnel 1,5 6 - D $ 64,433
Funding is provided for the closure of the pedestrian tunnel to ensure public safety.
Glendale Clinton Staircase 1,4,5 6 - D $ 380,000
Funding is provided for the repair of the stairway that provides pedestrian access between Glendale Blvd. and Clinton
St. to ensure pedestrian safety.
Glenoaks Boulevard (10810) Slope Mitigation 1,5 6 - C $ 755,000
Funding is provided by the SB1 Fund to install rockfall netting to prevent debris and slough from encroaching onto the
roadway and sidewalk to ensure public safety.
Glenoaks Bridge Over Burbank – Bridge Railing 1,4 7 - D $ 85,082
Funding is provided by the SB1 Fund to repair the damaged rail over the bridge to ensure the safety of vehicles and
pedestrians.
* "1" Health & Safety, “2” Legal Mandate, “3” Resiliency and Sustainability, “4” Operations and Cost Savings, “5” Equitable Community and Economic
Sustainability/Social Equity. “SEI” Social Equity Index (See CTIEP Summary for SEI definition). “GI” Green Investment.
** “PP” preliminary study. “D” design. “C” construction work. “R/W” land or building acquisition. “PC” post-construction.
929