Page 391 - 2022-23 Blue Book Vol 2
P. 391
CTIEP – Physical Plant
STREET PROJECTS
The capital improvements listed in this section are funded from the General Fund, Special Gas Tax Street
Improvement Fund, SB 1 Fund, Measure M Local Return Fund, Street Damage Restoration Fee Fund, and Measure R
Local Return Fund.
PROJECT TITLE CATEGORY* SEI* GI* ACTIVITY** 2022-23
AMOUNT
18th Street and 19th Street near Walker Ave 1 7 - D $ 400,000
Funding is provided by the SB1 Fund to install approximately 2,400 linear feet of 48-inch RCP along 19th St. between
18th St. & Walker Ave. and along 18th St. between Walker Ave. and Meyler St. The project will also construct
approximately 300 linear feet of 18-inch RCP connecting the proposed new curb opening catch basins to the main line
maintenance hole and junction structures. This project will alleviate flooding and improve safety of vehicle and
pedestrian traffic.
2nd Street Tunnel Rehabilitation 1,2,4 6 - D $ 1,500,000
Funding is provided by the SB1 Fund for design of the construction document, removal of the existing tiles, and
replacement of the existing drainage system to ensure safety of traffic within the tunnel.
2nd Street Tunnel Safety Maintenance and Cleaning 1,2,4 6 - C $ 72,000
Funding is provided by the SB1 Fund to improve the Supervisory Control and Data Acquisition (SCADA)
communication system that provides remote monitoring and control, and maintain various safety mechanisms within
the tunnel.
3rd Street Tunnel Safety Maintenance and Cleaning 1,2,4 6 - C $ 77,000
Funding is provided by the SB1 Fund to maintain various safety mechanisms within the tunnel.
7th Street Streetscape 1 7 C $ 3,844,000
Funding is provided by the SB1 Fund ($3,403,109), Street Damage Restoration Fee Fund ($220,000), and Measure R
Local Return Fund (220,891) for pedestrian safety improvements, including the installation of curb extensions, sidewalk
widening, and crosswalk enhancements.
Active Transportation Program Project Funding Gaps 1,3 - C $ 1,000,000
Funding is provided by the Measure M Local Return Fund for contingency funds for Active Transportation Program
projects that experience cost increases to ensure that the grant deadline can be met.
Affordable Housing and Sustainable Communities 1,5 - C $ 6,000,000
Projects
Funding is provided to front-fund various transportation improvement projects funded by the Affordable Housing and
Sustainable Communities Grant, which is a reimbursement grant.
Appian Way (8569) Bulkhead 1 8 - C $ 671,000
Funding is provided by the SB1 Fund to construct a bulkhead to provide lateral support to the existing roadway and
restore safe passage to pedestrians and vehicles.
* "1" Health & Safety, “2” Legal Mandate, “3” Resiliency and Sustainability, “4” Operations and Cost Savings, “5” Equitable Community and Economic
Sustainability/Social Equity. “SEI” Social Equity Index (See CTIEP Summary for SEI definition). “GI” Green Investment.
** “PP” preliminary study. “D” design. “C” construction work. “R/W” land or building acquisition. “PC” post-construction.