CTIEP – Physical Plant
STREETS PROJECTS (cont.)
PROJECT TITLE CATEGORY* SEI* GI* ACTIVITY** 2022-23
AMOUNT
Asilomar Boulevard Stabilization 1,4 8 - C $ 10,208,000
Funding is provided by the General Fund ($3,996,569), SB1 Fund ($5,279,827), and Street Damage Restoration Fee
Fund ($931,604) to install a series of deep soil mixing piles to stabilize Asilomar Blvd. and restore safety to the
roadway.
Automated Public Toilets 1,5 - - C $ 3,266,560
Funding is provided for the replacement of automated public toilets.
Avon Park Terrace (1431) Retaining Wall 1,4 7 - C $ 803,000
Funding is provided by the SB1 Fund to construct a new concrete retaining wall to restore lateral support and safety to
the roadway.
Balboa Blvd. Widening at Devonshire St. 1 7 - C $ 739,392
Funding is provided by the SB1 Fund to widen Balboa Blvd. for the creation of a second left turn lane in each direction
to facilitate traffic flow at this intersection and to upgrade existing access ramps to comply with the Americans with
Disabilities Act (ADA).
Berenice Place 1,4 6 - C $ 562,322
Funding is provided by the Street Damage Restoration Fee Fund to reconstruct approximately 225 foot long damaged
asphalt concrete pavement, install curb and gutter, and any required work to provide the proper draining and ensure
public safety.
Bicycle Lane Repair and Maintenance 1,4 - C $ 4,149,717
Funding is provided by the Street Damage Restoration Fee Fund ($470,608) and the Measure R Local Return Fund
($3,679,109) for the repair and maintenance of bicycle lanes to ensure public safety.
Bridge Maintenance Program 1,4 - - C $ 800,000
Funding is provided by the Measure R Local Return Fund for the repair and maintenance of bridges to ensure public
safety.
Browning Blvd. (1700) Pedestrian Tunnel Closure 1,5 5 - D $ 62,999
Funding is provided for the closure of the pedestrian tunnel to ensure public safety.
Bushwick Street Between Estara Ave. and Ave. 36 1,4,5 6 - D $ 792,305
Funding is provided by the Street Damage Restoration Fee Fund to reconstruct the asphalt concrete pavement,
sidewalk, curb ramp, and curb and gutter to ensure public safety
Cole Crest Drive (8464) Bulkhead 1,4 8 - C $ 496,000
Funding is provided by the SB1 Fund to replace an existing failing bulkhead with a new steel pile and pre-cast
concrete lagging bulkhead to restore lateral support and safety of the roadway.
* "1" Health & Safety, “2” Legal Mandate, “3” Resiliency and Sustainability, “4” Operations and Cost Savings, “5” Equitable Community and Economic
Sustainability/Social Equity. “SEI” Social Equity Index (See CTIEP Summary for SEI definition). “GI” Green Investment.
** “PP” preliminary study. “D” design. “C” construction work. “R/W” land or building acquisition. “PC” post-construction.